Work in Progress

IMG_8673

We are into Week 3 of the kitchen remodel and we’re seeing changes everyday. By the first week, we had all the cabinets and appliances removed, the random wall blocking the entrance to the kitchen counter was also removed. By the second week, the contractors started rewiring electrical and rerouting pipes.

IMG_8718

In the meantime, Jes installed a sink out in the patio, which has made washing dishes a lot easier than doing it all in the downstairs bathroom sink.

IMG_8765

New canister lights were installed, the counter height was lowered, and the wall was opened up (on the right).

This week, we will have the floors completed along with installation of the new cabinets.